Fecha/Hora
Date(s) - 08/07/2019
Todo el día
Ubicación
Escuela Politécnica Superior. Campus Milanera
Categorías
Department of Architectural and Engineering Building and Land.
From this moment the last phase of the Demo-site has begun, which involves measuring different comfort parameters in the rooms where these new tiles have been placed
Phases of the Demo-site:
- Placement of sensors and calibration of equipment.
- Measurement in the standard ceiling for 12 months.
- Installation of gypsum ceiling tiles LIFE-REPOLYUSE.
- Measurement on the ceiling with LIFE-REPOLYUSE gypsum tiles for 12 months.